Concrete Testing

Hwy 141 – Coleman, Wisconsin

 

This award-winning project was constructed by Michels Paving and consisted of approximately 10 miles of new four-lane warranted concrete pavement. During concrete paving operations, Michels Paving accelerated construction by using the maturity method to estimate concrete strength to determine when sections of newly paved roadway could be opened to construction traffic. As a consultant to Michels Paving, OMNNI Associates provided the following services:

  • Concrete mix design
  • Quality control testing during paving operations
  • Strength vs. Maturity curve development